Beaufort County Bridge #88

Client: NCDOT – Division 2, Greenville, NC
Engineer: NCDOT
Completion Date: 2018
Delivery: Design Bid Build

Project Summary

Replaced existing 62’ four-span timber deck and timber joist bridge with a single-span 70’ long by 33’ wide precast concrete cored slab bridge, along with approach slabs and 500 LF of associated paved asphalt roadway and drainage improvements.  Project also included relocation of 250 LF of 4” water line, with 125 LF of 6” HDPE trenchless installation.